next up previous contents
Next: 8 Function Testing Up: 7 GUI Testing Previous: 7 GUI Testing   Contents


7.1 GUI Test Reports

Test reports for GUI Testing will be stored in the group directory under test-reports/sam/GUI. These reports will be named GUITReport.NUMBER where NUMBER is the number of the report. GUI Testing is to take place on a weekly basis at the same time as the Weekly Code Review. The job of GUI Testing will rotate around the Team. The Review Manager will designate a team member to perform the GUI Testing as part of the Weekly Code Review.

The GUI test reports will also contain the System Testing report, as these steps will be performed at the same time by the person allocated to do GUI testing.