12 Acceptance Testing

Entry criteria: All other forms of testing have been performed.

Exit criteria: All Acceptance Tests pass.

Acceptance Testing is conducted to show the Client that the system performs as specified in the SRS. Acceptance Testing will consist of following through a number of the core requirements set out in the SRS to demonstrate the system's functionality.

Acceptance Tests must be clearly derived from the SRS and signed off by the client to ensure that passing the acceptance Tests means the product has satisfied the SRS.

Final tests will take place at the Client's site once RAMI is complete.

Test reports for Acceptance Testing will be stored in the group directory under /test-reports/sam/Acceptance for SAM and /test-reports/fcm/Acceptance for FCM.